It should be easy enough (not for me but maybe for you) to create a sort of belt between north epiphany pec, a board with one or more epiphany chip on a board, south pec and on board epiphany (in my case 16).
I don't know if it's possible but i imagine something similar to a token ring network (as a conceptual work flow).
Just evaluate and take me to reality if i told something wrong.
ThanksStatistics: Posted by adexmont — Thu May 29, 2014 7:03 am
]]>